Datacenter Power Systems Maintenance (Scheduled)
  • Priority - High
  • Affecting System - DC Electrical
  • During the scheduled maintenance window, the datacenter will be performing maintenance on their power switching systems (ATS).  This maintenance is to inspect and correct above normal thermal scans of the switching equipment.  During this window, power will be switched to UPS (power backups) so that the power feed can be  de-energized to safely work on the equipment.   Their power is expected to be out for at least two different times during the window for 45 minutes.   No service impact is expected from this work, however, there is a higher than normal risk of unexpected issues due to the nature of the work. 

  • Date - 10/16/2018 21:00 - 10/17/2018 06:00
  • Last Updated - 10/09/2018 13:50